BHEL HARIDWAR TRAINING REPORT BLOCK 3 PDF

Project Report By Rajeev Prajapati TRAINING REPORT. Express gratitude to those who were associated with my project training in BHEL. A Training report On “TURBINE MANUFACTURING” At BHEL HARIDWAR Submitted in partial fulfillment of requirements for the degree of. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar. Hitesh Gupta .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. BLOCK-3 Gas.

Author: Mausho Arashishicage
Country: Mauritania
Language: English (Spanish)
Genre: Sex
Published (Last): 7 April 2015
Pages: 457
PDF File Size: 3.39 Mb
ePub File Size: 18.21 Mb
ISBN: 836-3-30443-942-2
Downloads: 25033
Price: Free* [*Free Regsitration Required]
Uploader: Mezicage

Electrostatic precipitationAir preheaterFansWind electric generatorsDesalination plants. In fact, the steam will issue from the nozzle in the form of a high-speed jet. However, for assembling and inspection purposes there is no other solut ion. Th e Company has upgraded its products to contemporary levels through continuous in house efforts as well as through acquisition of new technologies from leading e ngineering organizations of the world.

During this phase, the damping is very 32 less.

Bhel Haridwar Training Report Block 3 Pdf

The shrunk on hub on the end of the retaining ring serves to reinforce the retaining ring and serves the end winding in the axial direction. The rotor is designed for radial ventilation by stem. The conductors are made of hard drawn silver bearing copper. Footings are provided the stator foundation shields enclose the ends of heavy end frame and form mounting of generator bear and radial shaft.

At the same time, a snap ring is provided against axial displacement of retaining ring. At their ends, the slots wedges are short circuited through the rotor body.

The shaft is rigidly coupled to generator rotor and exciter rotors are than supported on these bearings. It is forged from a vacuum cast steel slots for insulation of the field winding are made into the rotor body.

  LEGEA DETECTIVILOR PDF

These governors are used in turbines for controlling the speed of rotor wit hin the certain limits. BHEL is geared up to turnkey execution of electric trolley bus system s, light rail systems etc. Center lathe machine up to maximum length of 16 m and diameter of 3.

There is a conversion of heat energy to kinetic energy as the h eat energy from the decrease in steam enthalpy is converted into kinetic energy by the increased steam velocity. The training was specified under the Turbine Manufacturing Department.

Bhel haridwar training report !!

The high harixwar is applied to the inner casing, which is open at the exhaust end, letting the turbine exhaust to the out er casings. Click here to sign up. Under this collaboration agreement BHEL has established strong design manufacturing and servicing base for units up traiining MW ratings. Beside above, all kinds of the future engineers must know the basic requirements of workshop activities in term of man, machine, material, methods, money and other infrastructure facilit ies needed to be positioned properly for optimal shop layouts or plant layout an d other support services effectively adjusted or located in the industry or plan t within a well planned manufacturing organization.

They have a variety of centre lathe and CNC machines to perform the trainimg operation of blades.

The company has been successful in meeting varying nee ds of the industry, be it captive power plants, utility power generation or for the oil sector requirements. The power plant equipme nt manufactured by BHEL is based on contemporary technology comparable to the be st in the world and is also internationally competitive.

  LEY 27684 PDF

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

This insulation is void free and possess better mechanical properties. To keep the temperature cross section of the conductors could not be increased but this would introduce another problems.

When the frictional force between the rubbing surfaces is ve ry small as compared to the excitation force, the surfaces slip, resulting in fr iction damping. Naval guns with collaboration of Italy. Test procedure for measurement of leakage reactance of TG stator winding — SCOPE — This procedure covers the leakage reactance measurement of stator winding after completion of winding.

The dir ection, advice, discussion and constant encouragement given by them has been so harudwar full in completing the work successfully [i] INDEX S. Registration Forgot your password?

BHEL Haridwar Block 3 Turbine Manufacturing Training Report (1) – Free Download PDF

Turbo Generators are tested as per standards and customer requirements. To determine core leakage reactance Xc. Help Center Find new research reporh in: The longitudinal slots are distributed over the circumference. The company has been successful in meeting d emanding customer s requirements in terms of complexity of the works as well as technological, quality and other requirements viz.

This type of kinetic energy conversion is common in green energy cycles for applications ranging from larger wind turbines to small er hydrokinetic turbines currently being designed for and demonstrated in river and tidal applications.